Site last updated: Friday, April 25, 2025
Welcome, GuestSign In

Log In

Reset Password
MENU
Butler County's great daily newspaper

Crews at Baltimore bridge collapse continue meticulous work of removing twisted steel and concrete

In this photo provided by the U.S. Coast Guard, demolition crews begin cutting the top portion of the north side of the collapsed Francis Scott Key Bridge into smaller sections for safe removal by crane in the Patapsco River, in Baltimore, Saturday, March 30, 2024. Salvage teams used an exothermic cutting torch to systematically separate sections of the steel bridge, which will be taken to a disposal site. U.S. Coast Guard via AP

BALTIMORE — As divers assisted crews with the complicated and meticulous operation of removing the steel and concrete from the fallen Francis Scott Key Bridge in Baltimore, some near the site took time on Easter Sunday to reflect on the six workers presumed to have plunged to their deaths.

As cranes periodically swung into place and workers measured and cut the steel to prepare to lift sections of twisted steel, Rev. Ako Walker held a Mass in Spanish at Sacred Heart of Jesus, about 5 miles up the Patapsco River from the collapse.

“Yes we can rebuild a bridge, but we have to look at the way in which migrant workers are treated and how best we can improve their situation as they come to the United States of America,” Walker said of the men who were from Mexico, Guatemala, Honduras and El Salvador and were patching potholes.

Dive teams were in the river Sunday surveying parts of the bridge underwater and checking on the ship to ensure it can be safely floated away once the wreckage is lifted. Workers in lifts used torches earlier to cut parts of the twisted steel superstructure above water.

More in National News

Subscribe to our Daily Newsletter

* indicates required
TODAY'S PHOTOS